Low-Crested Structures In Front Of Rubble Mound Breakwaters
DOI:
https://doi.org/10.59490/coastlab.2024.711Keywords:
Set-up, Wave transmission, Wave overtopping, Coastal structures, Rubble mound structures, Dikes, Wave flume testsAbstract
Climate adaptation of coastal structures has become more important due to climate change, resulting in sea level rise and increased wave loading for coastal structures with depth-limited wave conditions. If sea level rise causes wave loading that becomes too severe, one of the options is to reduce the wave loading before the waves reach the existing coastal structure (see for instance Van Gent, 2019, and Van Gent and Teng, 2023). This can be achieved by increasing the foreshore (e.g. sand nourishment) or by constructing a low-crested structure in front of the coastal structure. In this study the climate adaptation measure to add a submerged low-crested structure in front of an existing (emerged) coastal structure has been studied. Between the two structures, structure-induced wave set-up occurs. This structure-induced wave set-up has been studied based on wave flume tests. The effects of structure-induced wave set-up on wave transmission at the low-crested structures and the effects on wave overtopping at the emerged coastal structure were also measured and analyzed.
To evaluate the performance of submerged low-crested structures Van Gent et al (2023) performed wave flume tests to examine wave transmission at various types of submerged low-crested structures, without an emerged structure behind the low-crested structures. For a submerged low-crested structure in front of an emerged coastal structure, the transmitted waves can be used as incident waves for estimates of wave overtopping at a rubble mound breakwater, using wave overtopping expressions described in Van Gent et al (2022). However, to verify whether the expressions for wave transmission and wave overtopping can be applied for submerged low-crested structures in front of rubble mound breakwaters, new physical model tests have been performed at Deltares. The new wave flume tests were performed with impermeable and permeable low-crested structures in front of impermeable and permeable emerged structures (see Figure 1 for permeable structure).
Downloads
Published
Conference Proceedings Volume
Section
Categories
License
Copyright (c) 2024 MARCEL R.A. VAN GENT
This work is licensed under a Creative Commons Attribution 4.0 International License.